Site Prep

Site preparation is customers responsibility and is very important for a good installation. We can install on lever ground, concrete, or asphalt. As a reminder we are not responsible for any site preparation.

Site Prep Checklist:

Mark all underground lines, where anchoring will take place

Land must be squared and leveled. (Call for more details)

Minimum work space of 2 feet around entire structure

When overhead power lines are present, a minimum of 10 feet is needed or power lines must be completely shut off

If installing on a slab we recommend 1 foot larger than the building to avoid cracking.

Site Prep is an important step for the installation of metal carports,  boat sheds, metal garages, barns and/or RV covers